Alaris® Pump module
Topic 2: Preparing an Infusion


Page 5 of 12

Glossary

Resources

Back

Next

Menu

Exit


Loading the Set into the Alaris® Pump module

To load the administration set into the Alaris® Pump module:

1. Remove the blue sheath from the pumping segment of the tubing:

2. Open the Alaris® Pump module door by gently pulling the front latch toward you.

3. Hold the upper fitment above the receptacle at the top of the Alaris® Pump module and lower it into the receptacle. The grooves in the fitment should fit square in the upper fitment tubing retainer.

(Note: Safety clamp is referred to on device as Flo Stop.)